Hi,
I have a backup copy job which runs forever. There are two VMs and I see the backup copy is backing up the hard disk with no progress.
How do I best troubleshoot it and I don’t see an option to cancel the job. I use VBR 12.1. I believe in earlier version it was possible to cancel a job. I use the immediate copy mode.
Thanks,
Edy