Hi everyone,
I have backup job stored on SOBR(Windows on-prem storage+azure blob). While backup is offloading to azure, it is getting cancelled because backup job runs. Is it possible for both offload goes on and backup runs without cancelling?
Hi everyone,
I have backup job stored on SOBR(Windows on-prem storage+azure blob). While backup is offloading to azure, it is getting cancelled because backup job runs. Is it possible for both offload goes on and backup runs without cancelling?
This usually occurs if there are not enough tasks slots open on the repository. The Backup job has a higher priority than the SOBR offload - so when job starts all the repo tasks are assigned to the proxies.
I allow the SOBR offload to trying doing one of the following:
What Changes should be done for workaround of point 3?
This usually occurs if there are not enough tasks slots open on the repository. The Backup job has a higher priority than the SOBR offload - so when job starts all the repo tasks are assigned to the proxies.
I allow the SOBR offload to trying doing one of the following:
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.