Hi all, I need support to find the correct way to merge 2 VEEAM Server into one.
We have VEEAM A and VEEAM B, both with their data domain. for now these two servers are separate and we want to merge A and B to have only A.
In my head we have to:
- Configure the DD of the VEEAM B on VEEAM A and rescan it.
- Configure a backup job with the VMs of the VEEAM B on the VEEAM A and, during the configuration, map the backup.
if we take these steps are we OK or I’m missing something?
Thank you.