VeeamON 2024 - Use Code "COMMUNITY10" for 10% Off!
Running Veeam B&R 11.0.1.1261 (11a? and fairly current)I was advised by our veeam rep to use a backup copy job to accomplish what I was trying to do. Basically:we have a daily backup job to disk with 60 days of restore points, and weekly full backups on Saturdays. I want to move a copy of ONLY the weekly full from this job to a different datastore that’s part of a scale-out repository, most specifically to use the backup copy job’s ability to apply GFS retention to what it’s copying Unfortunately the scheduling options for the periodic backup copy job leave a lot to be desired.The only option you have is “run this job every X days at Y time” - that’s it.Considering that normal backup jobs get a wide variety of scheduling options (most importantly in this case “run on specific day of the week” or “run after specific backup job”) it seems odd that none of these extremely useful options are available within backup copy jobs.Instead the only option is “run every 7 days” which means I
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.