On my esxi 7.0 cluster I’ve added a couple of VMs for testing. Having had B&R configured to backup entire hosts (with some VM exceptions) it obviously backed up these test VMs. I did not notice this change, since I’ve configured Veeam to not email me on successful backups.
Over the next days I removed these VMs. By doing so, Veeam completed to produce successful backups but today by accident I’ve noticed that it adds a single line message of the form “XXXX is no longer processed by this job. Make sure this change is intentional.”
Two questions:
- These last jobs were still successful. Therefore I’ve received no e-mail for them (even if I did, I’d tend to overlook content for jobs that ran without hitches). Would it be better to have this type of a job end with a warning exit code, instead of a success one?
- How can I avoid having this message in the next backups? Should I edit the job and, if so, edit it how exactly?
Best answer by MicoolPaul
View original